fcgov.com logo
fcgov.com print logo
FCGov.com logo holder
image of fort collins

BUILDING PERMIT SUBMITTAL REQUIREMENTS

RESIDENTIAL COMMERCIAL
New single family or additions:
  • Two sets of site plans (where the house will be/is located on the property) drawn to scale, show dimensions of lot. Submit on paper no larger than 8 1/2" x 14".
  • Two sets of structural drawings.
  • For new homes submit two sets of Engineered Foundation plans, Energy Code calculations and HVAC Load calculations. Forms available at Building & Zoning counter.
New commercial building:
  • Two sets of site plans
  • Two sets of Structural Drawings - stamped (by a Colorado licensed or registered architect or engineer.)
  • Two sets of stamped Engineered Foundation plans
  • Two sets of Electrical, Plumbing and Mechanical plans - stamped
  • Model Energy Code Calculations
  • PFA Plan Review Process(PDF format, 6k)
Basement finish: Interior remodel and tenant finish:
Decks, patio covers, sunshades, sheds and detached garages:

Footing and Foundation Only: F & F

For more detailed information see:

Building
Zoning
Other Info