Spring Creek at Edora Stream Restoration#

Restoration plan

Click to enlarge

Fort Collins Utilities and City Engineering worked to replace the bridge over Spring Creek at Edora Park and improve and restore the creek. Preliminary Utilities work began in September 2018 and work in Spring Creek began in 2019.

The Riverside Bridge project, which crosses Spring Creek near the Edora Pool Ice Center (EPIC), was replaced by City Engineering beginning in mid-September. Visit fcgov.com/engineering/riversidebridge for more information. 

City Engineering raised Riverside Avenue out of the 100-year floodplain. Utilities work to realign Spring Creek began in mid-January, and included stabilizing banks and improving fish and wildlife habitats. Revegetation and restoration of the landscape will continue through the summer of 2019. The creek improvements were scheduled for the fall and winter months to coincide with the lowest Spring Creek flows.

Riverside Bridge Replacement

Click to enlarge


Did You Know?

Fort Collins Utilities monitors water quality in our water sources, treated drinking water and treated water returned to the environment.

Wearing an extra layer of clothing during the winter and lowering the thermostat a few degrees can help save money and energy.

You can save approximately 50¢ per load by drying your laundry during off-peak hours.