Background#
Zach Elementary School is adjacent to a high-traffic arterial street, Kechter Rd., in southeast Fort Collins, serving neighborhoods on both sides of Kechter. Students living north of Kechter must cross the road to reach the school at Kechter's intersections with Cinquefoil Ln. or Jupiter Dr., often facing dangerous conditions due to driver speeds and suboptimal crossings. While students to the south benefit from safer residential streets, those to the north rely on a single signaled pedestrian crossing of Kechter at Jupiter Dr., which requires the use of a traffic control contractor during school hours to maintain safety.
Between 2017 and 2022 there were four rear-end crashes in this area, one involving a pedestrian.
To address these risks, this project will implement two key upgrades:
- Intersection of Kechter/Jupiter Dr.: Install a full traffic signal with a pedestrian walk signal
- Intersection of Kechter/Cinquefoil Ln.: Install a median refuge island and Rectangular Rapid Flashing Beacon (RRFB) for safer crossings
Project timeline#
- Procure Design Consultant
-
The City reviewed proposals and selected a design consultant in March 2024.
- Design Phase
-
Design development occurred with input from stakeholders; transportation safety study completed.
- Right of Way (ROW) Phase
-
The City is working with the Poudre School District to secure a temporary construction easement.
- Contractor Procurement
-
The City will initiate a competitive bid process to select a qualified contractor.
- Construction Phase
-
Construction will begin in early March, aiming to minimize disruption to public traffic.
Project impacts#
During the construction phase the project will impact Kechter near the intersections of Jupiter Dr. and Cinquefoil Ln. Pedestrian and vehicle detours will be implemented as necessary to ensure safety.
Project funding#
Total budget: $1.4 million
This project is funded by a Safe Routes to School grant and local funding sources, covering design, right-of-way acquisition, construction, and inspection.
For questions or concerns about this project, contact:
Gunnar Hale, Project Manager, 970-817-0456 or ghale@fcgov.com