Road Closure due to Water Main Repair - Lemay Avenue closed between Horsetooth Road and Harmony Road
Mid-Size Commercial Net Metering Rates#
Consumption of energy for net metering customers will be measured on a monthly basis and billed at the applicable seasonal rate. Excess energy produced and delivered to the utility will be credited based on the Net Metering Credits table at the bottom of the page.
E-250 Monthly Electric Rates includes PILOT - payment in lieu of taxes |
||
---|---|---|
Electric Energy | ||
Fixed Charge, per account
|
||
E250, E251: Single-phase, 200-amp service
|
$9.59 | |
E252: Single-phase, above 200-amp service
|
$20.46 | |
E253: Three-phase, 200-amp service
|
$12.51 | |
E254: Three-phase, above 200-amp service
|
$24.13 | |
Energy Charges per kWh: | ||
Summer (Jun-Aug)
|
7.37¢ / kWh | |
Non-Summer (Sept-May)
|
7.37¢ / kWh | |
Demand Charges per kWh: | ||
Summer (Jun-Sept)
|
$11.24 / kW | |
Non-Summer (Oct-May)
|
$6.36 / kW | |
Actual rates charged may vary slightly due to rounding. E251-E254 is the rate code printed on the monthly bill. Rate codes may also begin with the letter A or B for service in annexed areas where additional Rural Electric Association (REA) service rights fees apply. Fees equal to 5% are added to A rates and 25% service rights fees are added to B rates. |
Effective January 2022.
Net Metering Credits | |
---|---|
Energy credit | 4.19¢ / kWh |
Fort Collins Municipal Code Sec. 26-466, 7, 8.
Did You Know?
There are more than 500 miles of water mains throughout Fort Collins.
Insulating hot water pipes leading from the water heater helps keep your hot water from cooling off before it gets to the tap.
Wearing an extra layer of clothing during the winter and lowering the thermostat a few degrees can help save money and energy.